MyEnergy Engineering delivered a reliable off-grid power system, tailored to th...

Wastewater Treatment Plant, Containerised Off Grid Power System.

Containerised Off Grid Power System For a Water Treatment Plant.
1:58
Off-grid Power System Built In Shipping Container, For Alano Utilities Water Treatment Plant

Off Grid Power System Built In Shipping Container, For Alano Utilities Water Treatment Plant

Alano Utilities is the sewerage network provider for the Mount Barker, Wallaroo and Two Wells regions in South Australia. This off grid power project was for a new Alano Utilities water treatment plant located in Callington, where the property has no grid connection despite being just 20 km from the township of Mount Barker. Unlike typical commercial properties, a water treatment plant requires continuous, high-energy output to support essential water movement and filtration processes.

Off Grid Power System Built in a Shipping Container

MyEnergy Engineering were selected to design a fully tailored off grid power system to meet these specific needs. The system was built within a 20-foot insulated and air-conditioned shipping container, it was built at MyEnergy HQ and then transported to the site. Once onsite, our team installed and connected an extensive ground-mounted solar array, utilising 99.6kW of Jinko Solar panels.

To meet the treatment plant's continuous energy demands, we installed a substantial 96kWh Pylontech lithium battery system inside the shipping container, designed for easy future expansion.

Containerised Off Grid Power System Overview:

Key Components:

  • 20ft Customised Shipping Container

alano waters wastewater treatment plant callington off grid containerised power system


Tailored Off Grid Power for Continuous Operations

This off-grid power system delivers reliable, consistent energy tailored to the operational demands of the water treatment plant, ensuring critical infrastructure continues to perform without interruption. Designed and built by MyEnergy, with all works delivered by our in-house team, the system reflects a proven approach to supplying power in locations where no suitable dwelling or infrastructure exists to house equipment.

The project was recognised at the 2025 Master Electricians Australia Industry Excellence Awards, receiving 'Highly Commended' for Clean Energy Project of the Year – Commercial Project Under $1M. This recognition reflects the scale and quality of the solution delivered for a critical remote infrastructure application.

master electricians australia industry excellence awards 2025 alano waters commercial project of the year under $1m highly commended.

Our award-winning containerised off-grid power systems are purpose-built for remote and demanding environments. By integrating core components, including battery storage and control systems, into a secure, transportable container, we deliver a complete, ready-to-deploy solution that reduces installation time, protects equipment and simplifies long-term maintenance. This approach is particularly well suited to essential services such as water treatment, where reliable power is critical.

With a strong track record of delivering off-grid systems across Australia for agricultural, commercial and remote infrastructure applications, MyEnergy brings extensive experience to every project. Our in-house team manages the entire process from design and system build through to installation and commissioning, ensuring each system is built around real-world energy demands while allowing for future expansion.

 

Find out more about our Containerised Off Grid Power systems here: