Skip to content
  • There are no suggestions because the search field is empty.

Site Attendance Charges


Site attendance charges may apply when a MyEnergy team member is required to travel to the property to inspect, test or repair the system.

Charges may include:

  • Call-out fee
  • Travel time and vehicle costs
  • On-site labour
  • Accommodation or additional travel for remote locations
  • After-hours attendance
  • Parts and materials
  • Specialist equipment or access requirements
When Charges May Apply

Site attendance is generally chargeable where the issue relates to:

  • Internet, router or Wi-Fi changes
  • Generator servicing, fuel or starter batteries
  • Equipment not supplied or installed by MyEnergy
  • Third-party electrical work or setting changes
  • New appliances or increased electrical loads
  • Environmental, accidental or pest damage
  • Routine maintenance
  • No fault being found

If the issue is confirmed as an eligible MyEnergy installation fault, applicable attendance costs will generally be covered.

Manufacturer warranties do not always cover diagnostic labour, travel or call-out costs, even when replacement equipment is supplied under warranty.

MyEnergy will advise where possible if charges are likely before arranging attendance.

Information to discuss before a visit

Provide the site address, a description of the issue and any fault messages before attendance is arranged. Mention restricted access, locked gates, difficult tracks or equipment in an unusual location. Ask what the proposed visit covers and which cost items may apply. Keep the estimate or booking correspondence with your system records, and advise the team if the fault changes or clears before the scheduled visit.

Phone: 1300 706 870
Email: support@myenergysolar.com.au